SONIA SOTOMAYOR MIDDLE SCHOOL AT ADELPHI Top Row: Classroom - drywall, paint, and ceiling grid installed (interior); Gym - drywall installation (interior)Bottom Row: Electrical room (interior); HDPE Drainage pipe installation (exterior east side view)Project Executive: Christian BroylesPast Month’s Accomplishments: MEP rough-in in the gym completed.Drywall close-in on level 2 of sector...

SONIA SOTOMAYOR MIDDLE SCHOOL AT ADELPHI Project Executive: Christian Broyles Past Month’s Accomplishments: MEP rough-ins in sector 2K completed.Drywall close-in on level 2 of sector 1A completed.Installation of the entrance canopy steel completed.Retaining wall at the northeast loading dock completed.Installation of the storm water detention system completed.Installation of the...

SONIA SOTOMAYOR MIDDLE SCHOOL AT ADELPHI Project Executive: Christian BroylesPast Month’s Accomplishments: Installation of exterior metal wall panels and spray fireproofing in all other areas completed.Paving at the vehicular parking area 80% complete.MEP rough-in in sector 2B and drywall close-in on level 1 of sector 1B completed.Foundations for the...

ADELPHI MIDDLE SCHOOL Project Executive: Christian BroylesPast Month’s Accomplishments: Spray fireproofing, installation of exterior metal wall panels, and MEP rough-in at various levels of sector 2K completed.Underground sanitary piping installation at the south connector completed.Curb and gutter installation at the vehicular parking area completed.Drywall close-in on level 1 of sector...

ADELPHI MIDDLE SCHOOL Project Executive: Christian BroylesPast Month’s Accomplishments: MEPF hangers installation and interior stud wall layout on level 2 of building sector 1A completed.Installation and pouring of concrete stair tread infills at stairs 2 and 3 completed.Spray fireproofing on level 2 of building sector 2B completed.Installation of exterior metal wall...

ADELPHI MIDDLE SCHOOL Project Executive: Christian Broyles Past Month’s Accomplishments: MEPF hangers installation and interior wall layout at building sectors 2A and 2B completed.Installation and pouring of concrete stair tread infills at stair 2 completed.Spraying of fireproofing and ceiling hat channel installation at building sector 1B completed.Exterior wall panel installation at building sector...

ADELPHI AREA MIDDLE SCHOOL Project Executive: Christian Broyles Past Month’s Accomplishments: MEPF hangers and interior wall layout and fire proofing in building sector 1B completed.Installation of roof panels in building sectors 1A and 1B completed.Forming and pouring of concrete stage and ramp completed.Exterior wall panels in building sector 2K completed.Framing...

ADELPHI AREA MIDDLE SCHOOL Project Executive: Christian Broyles Past Month’s Accomplishments: Building perimeter exterior knee wall framing and MEPF hangers at building sectors 1A and 1B completed.Interior CMU block walls in the kitchen area completed.Interior wall layout building and elevated concrete deck pours at sector 1B completed.Interior CMU block walls in...

ADELPHI AREA MIDDLE SCHOOL Project Executive: Christian Broyles Past Month’s Accomplishments: Building perimeter knee wall framing and AVB at sector 2K completed.MEPF hangers and interior wall layout sector 1A completed.Structural steel erection in sectors1A and 1B completed.Exterior metal panel deliveries completed.Elevated concrete deck pours at sector 1A completed.Install roof panels at sectors 2K...

ADELPHI AREA MIDDLE SCHOOL Project Executive: Christian BroylesPast Month’s Accomplishments: All underslab plumbing and electrical completed.All concrete slabs on grade completed.Erection of steel in the Kitchen and Gym sectors completed.Erection of classroom steel in building sectors 1A and 1B in progress.Form/pour stage ramp/slab and foundation wall damp-roofing and...